Determine the organizational structure
The general control center is responsible for the overall management and control of LOTO. The general control center issues LOTO tasks to the main authorized personnel. After receiving the tasks, the main authorized personnel lead the authorized personnel to perform the LOTO tasks. Supervisors conduct supervisory review of authorized personnel to ensure that LOTO tasks are strictly implemented in accordance with procedures and systems throughout the process. Clarify the system of rewards and punishments, and strictly deal with violations of the LOTO operation process to ensure the effective implementation of the LOTO system and ensure the safety of employees.
Understand the equipment situation of the factory
Understand the existing equipment in the factory, formulate a distribution map of energy isolation points, and systematically code and place tagouts for each isolation point, so that it can be managed more effectively and work in an orderly manner. Select the appropriate lockout for each isolation point to ensure the smooth implementation of LOTO.
Determine The Isolation Point
Example of isolation point energy labeling
Identify energy sources. Hazardous energy sources are marked with a non-white background.